ELECTRIC MOBILITY AND ENERGY OPTIMIZATION

MULTISTOR 2

Power electronics for multi-source stationary storage

22 months

Project duration

€650K

allocated budget

Project Overview

The project is part of a rapidly growing stationary battery market designed to support renewable energies by reducing investment costs related to power electronics (12-14% of the total cost). > Objective: to use power electronics in a stationary storage system linking several energy sources (batteries, PV, wind) to better manage the grid and intermittent energies.

Methodology

4 work packages: potential study and business case, modeling and simulation, laboratory prototyping with second-life batteries, followed by proof of concept in real-world conditions. From March 2025 to December 2026.

Project Benefits

Reduction in system costs through the pooling of control and thermal management, simplified architecture replacing individual converters, increased durability, and easier addition of new batteries.

Implementation Stages

Project duration

Additional information

Additional information about this project will be available soon.

  • Lorem ipsum dolor sit amet adipiscing consectetur adipiscing elit

  • Lorem ipsum dolor sit amet adipiscing consectetur adipiscing elit

Yacine Sehimi - VEDECOM

Yacine Sehimi

Project lead

Contact

Project partners

Electric Mobility and Energy Optimization

Similar projects